Kashtan Logistics Park is a modern Class A warehouse facility that includes 3 state-of-the-art warehouses with a total area of 232 302 m2. The site is strategically located in Kolonshina village, along Zhytomyr-Kyiv highway - one of the country’s busiest arteries connecting central Ukraine to the West.

Close proximity to Zhytomyr highway provides Kashtan Logistics Park with easy transportation access and good site visibility. The site is also only 3 km away from the planned intersection of Zhytomyr highway with the new Ring road, which would provide additional accessibility to cargo traffic coming from Ukraine’s southern regions.
Design of Kashtan Logistics Park takes into account the ever-growing needs of our customers. Modern technologies and high-quality materials were selected for construction. The three-story office buildings will allow customers to operate with maximum efficiency.
Development:
Class A logistics complex consisting of 3 warehouses
Class A logistics complex consisting of 3 warehouses
Location:
Ukraine, Kyiv oblast
Kolonshina village, Makarov region
28 km from existing Ring road, 3 km from the planned Ring road
Ukraine, Kyiv oblast
Kolonshina village, Makarov region
28 km from existing Ring road, 3 km from the planned Ring road
Delins’ Role:
Developer and Investor
Developer and Investor
Architect:
BovisLendLease
BovisLendLease
Land Plot:
35.40 ha
35.40 ha
Area:
Total 232 302 m2:
• Warehouse 1: 102 524 m2
• Warehouse 2: 75 152 m2
• Warehouse 3: 54 626 m2
Total 232 302 m2:
• Warehouse 1: 102 524 m2
• Warehouse 2: 75 152 m2
• Warehouse 3: 54 626 m2
Technical Characteristics:
• Column grid – 12 x 24
• Clear ceiling height – 12 m
• Concrete floor with anti-dust overlay
• Floor capacity – min 6 t/ m2
• Loading docks – 1/1,000 m2
• Sprinkler system
• 1 truck parking lot per 1,000 m2 of warehouse premises and 2 car parking lots per 1,000 m2 of warehouse premises
• 24/7 security
• Column grid – 12 x 24
• Clear ceiling height – 12 m
• Concrete floor with anti-dust overlay
• Floor capacity – min 6 t/ m2
• Loading docks – 1/1,000 m2
• Sprinkler system
• 1 truck parking lot per 1,000 m2 of warehouse premises and 2 car parking lots per 1,000 m2 of warehouse premises
• 24/7 security
Schedule:
Delivery in 3 phases:
• Phase 1: April 2009
• Phase 2: January 2010
• Phase 3: September 2010
Delivery in 3 phases:
• Phase 1: April 2009
• Phase 2: January 2010
• Phase 3: September 2010
Consultants:
Colliers, DTZ
Colliers, DTZ
Commercial Terms:
Available upon request
Available upon request
Major Tenants:
Available upon request
Available upon request